Waltco DevelopmentCall
Menu

Guide

ADU Construction in Los Angeles — What to Know Before You Build

Waltco Development · Updated October 2026

Accessory dwelling units are one of the most common projects on Los Angeles lots. Here are the types, how permits work, and what to settle before construction starts.

The four kinds of ADU

California law recognises several ways to add a unit to a single-family lot:

  • Detached ADU: a separate building in the yard.
  • Attached ADU: an addition that shares a wall with the house.
  • Garage conversion: an existing garage turned into living space.
  • Junior ADU (JADU): a unit of up to 500 square feet created inside the existing home.

Permits

In the City of Los Angeles, ADU plans are reviewed and permitted by the Department of Building and Safety (LADBS). Santa Monica, Malibu, Manhattan Beach and Redondo Beach review ADUs through their own departments under the same state law. Lots in the coastal zone can need additional review.

What to settle before construction

  • How the unit will be used — rental, family, office — which shapes layout and finishes.
  • Utilities: whether the existing electrical service and sewer line can carry the new unit.
  • Access and parking for construction on your lot.
  • Who prepares the plans: a designer or architect draws them; we build from approved plans.

Questions

Frequently asked questions

Can I rent out my ADU?
Generally yes, subject to state and local rules on rental terms. Check current City of Los Angeles rules before you sign a lease.
Does Waltco design ADUs?
We build from plans prepared by your designer or architect and coordinate with them through plan check and construction.

Start your project

Let’s build something great together.

Tell us about the project and you get a reply from Waltco Development.

Call 213-792-5908Get your estimate